Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Xi'an Jingtian Investment Consulting Co., Ltd.

feasibility study report

sell
  • There is no classification
contact
  • Contact:王经理
  • Phone:18161913095
  • Email:13380581@qq.com
search
 
link
  • There is no link yet
home > sell > The unit that prepared the Xi'an feasibility study report Jingtian Keyan approved the project within 7 days
The unit that prepared the Xi'an feasibility study report Jingtian Keyan approved the project within 7 days
products: Views:8The unit that prepared the Xi'an feasibility study report Jingtian Keyan approved the project within 7 days 
brand: 经天可研7天立项
专业编制西安可行性研究报告: 乙级资质专业高效
西安可行性研究报告: 项目申请报告
资金申请报告: 西安可研报告
price: 1.00元/本
MOQ: 1 本
Total supply: 1 本
Delivery date: Shipped within 7 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2017-01-18 14:39
 
Details

Xi'an Jingtian Consulting has Class B qualifications, professional and efficient project establishment
Industry: Neng Jingtian Feasibility Research Project Project Source Project Type: Feasibility Study Report
Construction Unit: Yulin Anzhen Transportation Co., Ltd.
.Proposed construction site
The proposed construction site of this project is located at the national highway downlink station of Guidebao Village, Yuyang Town, Yuyang District, Yulin City, with convenient transportation and superior geographical location.
.Construction content and construction scale
The construction project is planned to cover an area of square meters (mu), and the total construction area of the project is square meters. The main construction content includes the square meters of aeration shed (including double gun aeration shed). Gas turbine station), gas storage tank area square meters, and offices, lounges and charging halls totaling square meters will be built at the same time.
After the project is completed, it will achieve an annual gas supply volume of 10,000 m2 (daily gas supply volume, gas supply days/year), basically meeting the gas demand of vehicles passing through the local area.
.Total project investment and benefit status
The total project investment is 10,000 yuan, all of which is self-raised by Yulin Anzhen Transportation Co., Ltd.
The normal annual sales income of this project is 10,000 yuan. After the project reaches capacity, the business tax and surcharges will be paid every year. The static after-tax investment payback period is .years, and the dynamic after-tax investment payback period is .years. The project benefits are good.
.Project construction period
The total project construction period is years.
.Jingtian Keyan has three major advantages:
(), the first time the project was approved, it is more professional and less fussy.
(), full & tracking service.
(), its business covers all provinces and cities across the country, with a wide service area and a full range of project types.
Taobao store search: Jingtian Keyan
Baidu search: Jingtian Keyan
Request for quotation
A total of0articles  Related Comments: